, ,

Operating Guideline 7 (OG7) version 3.6 released, checklists updated and available on the SLP web for immediate use.

The new 3.6 version checklist must be in use by no later than the 1st of May 2026.

Operating Guideline OG7-3.6

2008-2020-isotainer-checklist-OG7-v3-6-mar2026

2008-2020-skel-trailer-dolly-checklist-OG7-v3-6-mar2026

2008-prime-mover-checklist-OG7-v3-6-mar2026

2020-prime-mover-checklist-OG7-v3-6-mar2026

2008-tanker-trailer-checklist-OG7-v3-6-mar2026

2020-tanker-trailer-checklist-OG7-v3-6-mar2026

2008-rigid-tanker-checklist-OG7-v3-6-mar2026

2020-rigid-tanker-checklist-OG7-v3-6-mar2026


Update Details in OG7 3.6

5.15 Stowage of hoses and equipment – Ref: AS5602:2009 Section 6.4 – Ref: NTC Load restraint guide – Ref: AS2809.1:2023 

All accessories and removable equipment must be securely restrained to prevent ejection during a crash or incident. If a product bucket (draining, slops, or drip bucket) is carried, it must be metal, fitted with a sealable lid, and equipped with a static-earth lead and bonding clamp. A lid is not required if the tanker is fitted with a dedicated slops/drainings tank for containing product during transit. The bonding clamp and bucket must be tested every six months using an ohmmeter or suitable device, and resistance must not exceed 10 ohms (Ω)


A new checklist has been developed to assist with the compliance checks for loading isotainer’s in SLP participating loading facilities. “2008-2020-isotainer-checklist-OG7-v3-6-mar2026”

The skel trailer dolly checklist has been updated to include driveway protection requirements when isotainer’s are loading on skel’s “2008-2020-skel-trailer-dolly-checklist-og7-v3-6-mar2026”

Other checklists remain unchanged:
2008-prime-mover-checklist-OG7-v3-6-mar2026
2020-prime-mover-checklist-OG7-v3-6-mar2026
2008-tanker-trailer-checklist-OG7-v3-6-mar2026
2020-tanker-trailer-checklist-OG7-v3-6-mar2026
2008-rigid-tanker-checklist-OG7-v3-6-mar2026
2020-rigid-tanker-checklist-OG7-v3-6-mar2026


SLP General Manager
Greg Royston