, ,

Operating Guideline 7 Update Version 3.5

Safe Load Program Operating Guideline 7 (OG7) document and its checklists have just been updated and released on the SLP web for use immediately by all SLP Authorised Inspection Locations.

The new 3.5 version checklist must be in use by no later than the 1st of January 2025.

OG7-V3.5-Nov2024.pdf

2008-Prime-Mover-Inspection-Checklist-OG7-V3.5.pdf

2008-Tanker-Trailer-Inspection-Checklist-OG7-V3.5.pdf

2008-Rigid-Tanker-Inspection-Checklist-OG7-V3.5.pdf

2008-Skel-Trailer-Dolly-Inspection-Checklist-OG7-V3.5.pdf

2020-Prime-Mover-Inspection-Checklist-OG7-V3.5.pdf

2020-Tanker-Trailer-Inspection-Checklist-OG7-V3.5.pdf

2020-Rigid-Tanker-Inspection-Checklist-OG7-V3.5.pdf

2020-Skel-Trailer-Dolly-Inspection-Checklist-OG7-V3.5.pdf

What are the changes in Version 3.5?

Update Details

  • Section 3.1.2 updated information relating to the RTS tags and the Return To Service requirements.
  • Section 5.1.5 Draining buckets, lids, static leads and clips
  • Section 5.8.3 Delivery emergency stop testing and internal valve closure confirmation 

Documents located within the SLP APP and online electronic inspection checklist are currently being updated with the new version and will be ready for use by the 1st January 2025

Older Documents can be found here:

OG7-V3.4-19-Oct2020

2008-Prime-Mover-Inspection-Checklist-OG7-V3.4

2008-Tanker-Trailer-Inspection-Checklist-OG7-V3.4

2008-Rigid-Tanker-Inspection-Checklist-OG7-V3.4

2008-Skel-Trailer-Dolly-Inspection-Checklist-OG7-V3.4

2020-Prime-Mover-Inspection-Checklist-OG7-V3.4

2020-Tanker-Trailer-Inspection-Checklist-OG7-V3.4

2020-Rigid-Tanker-Inspection-Checklist-OG7-V3.4

2020-Trailer-Dolly-Inspection-Checklist-OG7-V3.4

Manufacture-or-AVE-Approval-process-V1.4

SLP Manager
Lee Stringer